
Brahmaputra Infrastructure Secures Major Performance Based Maintenance Contract for NH-502A in Mizoram
Brahmaputra Infrastructure Ltd. has successfully signed a significant contract for the Performance Based Maintenance Contract (PBMC) on NH-502A, a crucial corridor in southern Mizoram. The agreement was awarded by the Ministry of Road Transport & Highways (MoRT&H), Government of India, executed through the Chief Engineer, PWD (Highway), Aizawl, Mizoram.The contract details the operation and maintenance of the NH-502A corridor, stretching from Km 0.000 to Km 87.180, including monsoon maintenance. The contract tenure spans 60 months (5 years).
The key details of the contract are as follows:
| Parameter | Details |
|---|---|
| Awarding Authority | Ministry of Road Transport & Highways (MoRT&H), Govt. of India through Chief Engineer, PWD Highway, Aizawl |
| Contract Name | Performance Based Maintenance Contract (PBMC) on NH-502A from Km 0.000 to Km 87.180 |
| Scope of Work | Operation and Maintenance of NH-502A corridor including monsoon maintenance |
| Contract Length | 87.180 km |
| Contract Tenure | 60 months (5 years) |
| L1 Quoted Value | ₹ 701.8 Million |
| Division | Multi Modal Project Division |
Strategic and Operational Importance
The NH-502A corridor plays a strategically vital role, connecting the Myanmar border with Lawngtlai, representing one of the most remote and significant stretches in India's Northeast. The execution of this contract requires Brahmaputra Infrastructure to establish comprehensive local infrastructure, including camps, logistics, machinery, and manpower in challenging terrain. This operational commitment is anticipated to grant the Company a durable competitive advantage, positioning it favorably for future infrastructure works in the India-Myanmar border belt by agencies such as the Border Roads Organisation (BRO), MoRT&H, and PWD.Financial Outlook
The formalization of this agreement represents a major milestone for the Company. With a contract value of ₹ 701.8 Million, the five-year engagement is expected to substantially contribute to the Company's operational footprint and revenue streams in the Northeast region. The Company projected an EBIDTA margin ranging from 15 to 20% from this specific project.The secured contract underscores the Company's technical capabilities and competitive strength in managing complex highway maintenance operations within challenging frontier environments.
BRAHMINFRA Stock Price Movement
Brahmaputra Infrastructure Limited shares slipped by 2.88% today, settling at ₹159.42 after shedding ₹4.73 in a closed market session.The decline was dramatic, as trading pressures drove the stock to its 52-week low, with over 31,772 shares traded during the day.Disclaimer: Due care and diligence have been taken in compiling and presenting news and market-related content. However, errors or omissions may arise despite such efforts.
The information provided is for general informational purposes only and does not constitute investment advice, a recommendation, or an offer to buy or sell any securities. Readers are advised to rely on their own assessment and judgment and consult appropriate financial advisers, if required, before taking any investment-related decisions.
Any views, opinions, or statements expressed, where applicable, are those of the respective analysts or experts and do not reflect the views of this website. The website has no association with such viewpoints and does not assume any responsibility for them.