Adani Green Energy Operationalizes 510.1 MW Power Projects in Gujarat

Adani Green Energy Operationalizes 510.1 MW Power Projects in Gujarat

Adani Green Energy Operationalizes 510.1 MW Power Projects in Gujarat​

Adani Green Energy Limited (AGEL) has operationalized 510.1 MW of power projects located in Khavda, Gujarat, through its stepdown subsidiaries. The projects, detailed in Annexure A, commenced power generation on March 22, 2026, following clearance approvals.

With this development, AGEL’s total operational renewable generation capacity now stands at 17,982.3 MW. The decision to operationalize the plants was made on March 22, 2026, at 10:58 p.m.

Project Details

The following table outlines the projects and their respective capacities:

Name of SPVsType of ProjectCapacity (MW)
Adani Green Energy Twenty Six B LimitedSolar125
Adani Green Energy Twenty Six B LimitedHybrid16
Adani Green Energy Twenty Four LimitedSolar150
Adani Hybrid Energy Jaisalmer Five LimitedWind2.6
Adani Hybrid Energy Jaisalmer Five LimitedHybrid54
Adani Solar Energy Jodhpur Six LimitedSolar25
Adani Green Energy Twenty Six A LimitedWind137.5
TotalTotal510.1


Source:​

 

Disclaimer: Due care and diligence have been taken in compiling and presenting news and market-related content. However, errors or omissions may arise despite such efforts.

The information provided is for general informational purposes only and does not constitute investment advice, a recommendation, or an offer to buy or sell any securities. Readers are advised to rely on their own assessment and judgment and consult appropriate financial advisers, if required, before taking any investment-related decisions.

Back
Top