
HyperNext Places Order for 192 MW of Kirloskar Oil Engines Limited’s Optiprime™ Power Systems
Kirloskar Oil Engines Limited (KOEL), a prominent manufacturer of power generation solutions in India, has secured a significant order from HyperNext, a company specializing in next-generation digital infrastructure. The contract involves the supply of 96 units of KOEL's 2500 kVA Optiprime™ Dual Core power systems, totaling 192 MW. This deployment represents one of the largest planned installations of high-capacity standby power systems for data centers in India.The order underscores a strong commitment to reliable and sustainable digital infrastructure as HyperNext expands its footprint in the hyperscale-ready, AI-enabled data center sector. KOEL's Optiprime™ platform is designed for mission-critical environments and combines multiple high-performance cores into a single integrated power system, ensuring industry-leading operational efficiency and reliability.
HyperNext focuses on creating future-ready data center ecosystems that support hyperscale cloud deployments and AI workloads. The collaboration between the two companies highlights their shared focus on powering India's digital economy.
Harsh Macwann, Group CEO of HyperNext, commented on the partnership, stating that KOEL’s Optiprime™ solution offers the scale and engineering sophistication required for mission-critical data center environments. He added that being India's first data center with an 800VDC power architecture makes this partnership reflective of their combined commitment to enabling advanced digital infrastructure while maintaining operational resilience.
Madan Patil, President of Global Powergen Business at Kirloskar Oil Engines Limited, stated that the order reflects increasing confidence in KOEL’s engineering capabilities. He emphasized that as AI and cloud adoption accelerate globally, data centers require robust backup power systems, which the Optiprime™ platform is specifically designed to provide for hyperscale facilities.
KOEL continues to strengthen its position as a trusted partner across critical sectors including data centers, cloud service providers, colocation operators, and enterprises both domestically and internationally.
Key Details of the Order:
| Component | Specification |
|---|---|
| Product Supplied | Optiprime™ Dual Core Power Systems |
| Capacity per Unit | 2500 kVA |
| Total Units Ordered | 96 units |
| Total Capacity Deployed | 192 MW |
HyperNext is dedicated to developing the infrastructure foundation for the digital economy through sustainability-focused design and operational excellence. Kirloskar Oil Engines Limited boasts a legacy of over 75 years, offering comprehensive engine and power systems solutions across various critical sectors, including data centers, marine, defense, and railways.
KIRLOSENG Stock Price Movement
Today, Kirloskar Oil Engines Limited stocks settled at ₹1991.50 after advancing by 0.83% in the session. The share price traded within an intraday range spanning from a low of ₹1948 to a high of ₹2022.Disclaimer: Due care and diligence have been taken in compiling and presenting news and market-related content. However, errors or omissions may arise despite such efforts.
The information provided is for general informational purposes only and does not constitute investment advice, a recommendation, or an offer to buy or sell any securities. Readers are advised to rely on their own assessment and judgment and consult appropriate financial advisers, if required, before taking any investment-related decisions.
Any views, opinions, or statements expressed, where applicable, are those of the respective analysts or experts and do not reflect the views of this website. The website has no association with such viewpoints and does not assume any responsibility for them.